General information

IMO:
8512865
MMSI:
620272000
Callsign:
D6A2272
Width:
20.0 m
Length:
122.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Cargo Ship
Ship type:
Flag:
Comoros
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Anchored
Course:
17.9° / 0.0
Heading:
90.0° / 0.0
Speed:
Max speed:
Status:
anchorage
Area:
Gulf of Aden
Last seen:
2024-04-28
4 min ago
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
7 min ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-04-17
2024-04-18
16h 43m
2024-04-06
2024-04-08
2d 2h 14m
2024-03-27
2024-04-03
6d 18h 29m
2024-03-20
2024-03-20
6h 25m
2024-02-06
2024-02-06
8h 54m
2024-01-25
2024-02-04
9d 10h 27m
2024-01-16
2024-01-17
14h 41m
2024-01-13
2024-01-15
1d 11h 53m
2023-12-13
2023-12-14
1d 10h 16m
2023-10-18
2023-10-24
6d 10h 43m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Jeddah South
2024-04-23
Enter
Jeddah North
2024-04-22
Enter
Suez
2024-04-18
Enter
Port Said
2024-04-18
Enter
Marmara Island
2024-04-09
Enter
Bosphorus Bridge 1
2024-04-06
Enter
Bosphorus Bridge 2
2024-04-06
Enter
Note: All times are in UTC

Latest news

Fire off Ukrainian coast

Sun Feb 14 18:34:13 CET 2021 Timsen

On Feb 12, 2021, a fire broke out aboard the 'Prince 4' off the Ukrainian coast. The ship, which was loaded with 11,500 tons of grain, had left Nikolayev at 04.50 a.m. enroute to Yemen when the fire broke out understood at portside the stern region and later spread to the upper deck. Tugs responded at 6.30 p.m. and started firefighting. The 19 crew members, ncluding Syrian and Indian nationalities, remained on board and assisted in firefighting. The ship was taken in tow towards Ochakov.

Engine failure in Gemlik

Wed Dec 19 10:18:14 CET 2018 Timsen

The "Prince 4" suffered a failure of the auxiliary machinery and pertinent systems on Dec 17, 2018, in Gemlik. The vessel's departure permission has been cancelled by the harbour master until the completion of permanent repairs. The state surveyor was to attend on board in order to verify the final repair status. Repairs were being carried out by the crew, and the ship remained stationary at the Roda Liman Container Terminal by Dec 19. On Dec 21 at 10 p.m. the vessel left Gemlik bound to Yalova.

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data