ADIYAMAN
Kurs/Position
Die letzten Häfen
Die letzten Wegpunkte
Die neuesten Nachrichten
Detention in Rhodes
On June 24, 2025, the 'Adiyaman' was detained in Rhodes with six deficiencies, all of which being regarded as seriously and grounds for a detention: 1) Emergency system - Muster list Missing 2) Labour conditions - Water, pipes, tanks Not as required 3) Labour conditions - Fitness for duty - work and rest hours Work hours exceeded 4) Fire safety - Means of escape Blocked 5) Cargo operations - Cargo transfer tankers Damaged 6) ISM - Ism certificate Not as required The vessel was released again on June 28 and left the port enroute to Elevsis, where it anchored in pos. 38° 01' N 023° 32' E on June 29. https://www.facebook.com/profile.php?id=100063576908591
Engine failure in Aliaga
The 'Adiyaman' suffered an engine failure at Aliaga on Sep 23, 2019. As repairs could not be carried out by the crew, the tug 'Yumurtalik' started towing the stricken vessel to Tuzla, where it arrived on Sep 28 at 5 p.m. It left from Tuzla again on Oct 19 and arrived in Tutunciftlik on Oct 20.
News schreiben