Allgemeine Informationen

IMO:
MMSI:
244740681
Rufzeichen:
PG4499
Breite:
16.0 m
Länge:
135.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Tankship
Ship type:
Flagge:
Netherlands
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moored
Kurs:
360.0° / -128.0
Kompasskurs:
511.0° / -128.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moored
Location:
Rotterdam (Odfjell Terminals Rotterdam - Berth 04)
Gebiet:
Netherlands
Zuletzt empfangen::
2024-05-05
vor 3 Min
Source:
T-AIS
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 5 Min
Source:
T-AIS
Berechnete ETA:

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2024-05-03
1d 9h 44m
2024-04-26
2024-05-03
6d 7h 1m
2024-04-24
2024-04-26
1d 23h 27m
2024-04-24
2024-04-24
1m
2024-04-22
2024-04-23
1d 56m
2024-04-19
2024-04-22
2d 10h 12m
2024-03-08
2024-04-14
37d 2h 37m
2024-03-07
2024-03-07
3h 38m
2024-03-06
2024-03-06
52m
2024-03-05
2024-03-06
1d 7h 21m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
Zandvliet Locks
2024-04-14
Abfahren
Antwerp Doel
2024-04-14
Abfahren
Boudewijn Locks
2024-03-08
Ankommen
Hans Weert
2024-01-08
Ankommen
Terneuzen
2024-01-08
Abfahren
Terneuzen Locks approach
2024-01-08
Abfahren
Hinweis: Alle Zeiten in UTC

Die neuesten Nachrichten

Battery caused smoke development

Thu Jan 30 22:18:06 CET 2020 Timsen

A smoldering battery caused smoke development in the engine room of the 'Argonon' which was berthed at the quay in Rilland while transiting the Scheldt-Rhine Canal enroute from Antwerp to Rotterdam in the morning of Jan 30, 2020. The fire brigade was alerted and attended with two fire trucks. They mastered the situation by removing the fuses from the batteries. Then the batteries were disconnected from the main engine and had then to be cooled. The ship was then able to continue the voyage and arrived at the Heysche Port in Rotterdam at 9.30 p.m. Dutch report with photo: https://www.omroepzeeland.nl/nieuws/117847/Smeulende-accu-zorgt-voor-rook-in-machinekamer-van-schip-in-Schelde-Rijnkanaal

First LNG Bunkering Takes Place at Port of Antwerp

Wed Dec 12 09:37:21 CET 2012 arnekiel

Port of Antwerp has announced that the first liquified natural gas (LNG) bunkering operation at a Belgian port has taken place. The Port said that on Wednesday last week (Dec. 5, 2012) the LNG powered barge Argonon operated by Deen Shipping was bunkered by an LNG truck. "This represents a further significant step towards more environment-friendly shipping in the port of Antwerp," the port said. http://shipandbunker.com/news/emea/713049-first-lng-bunkering-takes-place-at-port-of-antwerp

World’s first LNG-fueled inland tanker delivered

Fri Dec 16 09:09:29 CET 2011 arnekiel

The world's first new LNG-fuelled tanker has been delivered in Rotterdam to Lloyd's Register class, heralding the start of a new era of cleaner shipping for Europe's local waterways, Yourshipbuildingnews reports. The delivery of MT Argonon, a 6,100-dwt dual-fuelled chemical tanker, represents a significant milestone for the Deen Shipping subsidiary, Argonon Shipping B.V., in its pursuit of cleaner transport solutions for Europe. Lloyd’s Register helped the owners and regulators to identify their risks, meet regulatory requirements and overcome the technical challenges for the precedent-setting tanker. The dual-fuel system is designed to burn an 80/20 mixture of natural gas and diesel, reducing Sox, Nox and particulate-matter emissions, as well as reducing the greenhouse gas emissions from tank to flue. The LNG is stored in a transport tank located on deck, supplied by Cryonorm Projects, based near Amsterdam.

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data