Allgemeine Informationen

IMO:
9101132
MMSI:
233933000
Rufzeichen:
MVEP4
Breite:
24.0 m
Länge:
146.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Other Ship
Ship type:
Flagge:
United Kingdom
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moving
Kurs:
190.0° / -127.0
Kompasskurs:
190.0° / -127.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moving
Gebiet:
NORTH PACIFIC OCEAN
Zuletzt empfangen::
2023-05-23
vor 5 Tagen
 
Source:
T-AIS
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 5 Tagen 
Source:
T-AIS
Berechnete ETA:

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2023-05-21
2023-05-22
23h 6m
2023-05-15
2023-05-20
4d 5h 24m
2023-04-15
2023-05-15
30d 15h 18m
2023-04-10
2023-04-11
4h 8m
2023-04-03
2023-04-05
2d 1h 52m
2023-03-10
2023-03-11
22h 27m
2023-02-13
2023-02-15
1d 10h 40m
2023-01-19
2023-02-01
12d 1h 48m
2023-01-16
2023-01-19
2d 22h 45m
2022-12-18
2023-01-16
28d 22h 54m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
-
-
-

Die neuesten Nachrichten

Allision in Victoria

Wed Nov 28 11:17:22 CET 2018 Timsen

The Transportation Safety Board of Canada (TSB) has deployed a team of investigators to Victoria, British Columbia, where the "Cable Innovator" struck a dock while berthing on Nov 22, 2018, at 1.15 a.m. The ship was coming from Port Angeles and remained berthed at Ogden Point since. The TSB intended to gather information and assess the occurrence.

Ballast water treatment system installed on Cable Innovator

Sat Apr 18 10:42:00 CEST 2015 arnekiel

Global MarineSystems Limited’s vessel Cable Innovator has recently left Damen Shiprepair Dunkerque (part of Damen Shiprepair & Conversion) after extensive work including the installation of a ballast water treatment system and a 5-year survey.

Cable Innovator to lay cable between Dublin and Holyhead

Mon Dec 12 07:17:01 CET 2011 arnekiel

A specialist cable-laying vessel, Cable Innovator (1995/14,277 tonnes) arrived into Dublin Port yesterday. She is due start work next week on a €12.5m telecoms cable for CeltixConnect between Dublin and Holyhead. According to a report in The Irish Times (click HERE) CeltixConnect's chief executive Diane Hodnett expected customers to start transmitting traffic on the cable at the end of January. The cable will pass through the East Point Business Park in Dublin and on to the city's IFSC. On the Welsh side, the 131km cable will connect to the Welsh Assembly-funded Parc Cybi business park in Holyhead. From there it will connect to networks linking Manchester, London and the rest of Europe. http://afloat.ie/port-news/port-and-shipping-news/item/17542-new-irish-sea-telecoms-cable-to-link-up-london-and-europe

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data