Allgemeine Informationen

IMO:
8769121
MMSI:
636018842
Rufzeichen:
D5RQ4
Breite:
78.0 m
Länge:
117.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Other Ship
Ship type:
Flagge:
Liberia
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Anchored
Kurs:
285.5° / -8.0
Kompasskurs:
86.0° / -8.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
anchorage
Gebiet:
Caribbean Sea
Zuletzt empfangen::
2024-04-25
vor 1 Min
Source:
T-AIS
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 1 Min
Source:
T-AIS
Berechnete ETA:

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2018-10-07
2018-12-17
71d 5h
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
-
-
-

Die neuesten Nachrichten

DEVELOPMENT DRILLER3 8769121

Mon Sep 20 11:18:10 CEST 2010 Timsen

With a final shot of cement, BP Plc on Sep 19, 2010, permanently killed its deep-sea well in the Gulf of Mexico that ruptured on April 20. 153 days after the Macondo well ruptured, the BP succeeded in drilling a relief well nearly 18,000 feet below the ocean surface from the "Development Driller III" and permanently sealing the well with cement. The Macondo 252 well is effectively dead now and poses no more threat to the Gulf of Mexico. On Sep 16, a relief well bored into the bottom of the Macondo well to pump in cement and seal the reservoir for good. BP pumped cement for seven hours on Sep 17, and finished a pressure test early on Sep 19 that showed the well was permanently clogged. The development provided an end to the disaster nearly five months after the well ruptured on April 20, causing an explosion aboard the “Deepwater Horizon” drilling rig that killed 11 workers and spewed more than 4 million barrels of oil into the sea.

DEVELOPMENT DRILLER3 8769121

Fri Sep 17 10:58:46 CEST 2010 Timsen

An emergency relief well has successfully intersected the "Deepwater Horizons"'s damaged oil well on Sep 16, 2010. Through a combination of sensors embedded in the drilling equipment and sophisticated instrumentation that is capable of sensing distance to the well casing, BP engineers and the federal science team have concluded that the "Development Driller III" relief well has intersected the Macondo well. Next, crews will prepare to pump cement into the well's outer ring and complete the 'bottom kill' of the well within the next 3 days.

DEVELOPMENT DRILLER3 8769121

Mon Jul 05 11:13:13 CEST 2010 Timsen

The relief drill of the "Development Driller III" at the sinking site of the "Deepwater Horizon" is actually at 11,817 ft below the seabed and moving carefully in order to locate the Macando wellbore.

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data