Allgemeine Informationen

IMO:
9510591
MMSI:
636020734
Rufzeichen:
5LAL3
Breite:
19.0 m
Länge:
116.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Tankship
Ship type:
Flagge:
Liberia
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moored
Kurs:
148.0° / 0.0
Kompasskurs:
339.0° / 0.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moored
Location:
Jebel Ali (DPWorld Jebel Ali Container Term3)
Gebiet:
United Arab Emirates
Zuletzt empfangen::
2024-04-26
vor 21 Min
Source:
T-AIS
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 8 Std
Source:
T-AIS
Berechnete ETA:

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2024-04-26
6h 56m
2024-04-25
2024-04-26
16h 8m
2024-04-22
2024-04-23
1d 8h 4m
2024-04-20
2024-04-21
17h 51m
2024-04-14
2024-04-15
21h 25m
2024-04-14
2024-04-14
8h 1m
2024-04-13
2024-04-13
7h 58m
2024-04-12
2024-04-13
14h 53m
2024-04-11
2024-04-12
1d 6h 15m
2024-04-08
2024-04-09
21h 52m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
Strait of Hormuz
2024-02-12
Ankommen
Strait of Hormuz
2024-02-10
Abfahren
Strait of Hormuz
2024-02-01
Ankommen
Strait of Hormuz
2024-01-27
Abfahren
Strait of Hormuz
2024-01-13
Ankommen
Strait of Hormuz
2024-01-09
Abfahren
Strait of Hormuz
2024-01-01
Ankommen
Hinweis: Alle Zeiten in UTC

Die neuesten Nachrichten

Tanker repaired in Tuzla

Mon Apr 19 10:18:10 CEST 2021 Timsen

Repairs of the 'Olesya' in Tuzla have been completed on April 16, 2021. The vessel shifted from the repair yard to the anchorage in the afternoon. Sea trials were ti be carried out under the supervision of a class surveyor together with the owner's superintendent before a new set of trading documents is issued upon its completion and a final inspection. The ship had suffered an engine failure at Chaguaramas on March 1, 2018. Repairs initially could not be carried out by due to financial difficulties. The vessel was towed to Tuzla on Feb 6.

Repairs of engine damage in Tuzla

Tue Mar 16 10:20:04 CET 2021 Timsen

The 'Olesya', which had suffered anp engine failure at Chaguaramas, Trinidad & Tobago, on March 1, 2018, and was towed to Tuzla on Feb 6, 2021, was subject of a detailed damage survey by the surveyor panel together with the owner's superintendent and shipyard engineers since. Permanent repairs have been commenced. Steel thickness measurements were taken by the survey company. Further maintenance of rudder, propeller and shaft system were in progress. The vessel remained stationary in the shipyard as of March 16.

Disabled tanker towed to Tuzla

Mon Feb 08 10:47:03 CET 2021 Timsen

Repairs of the 'Olesya' which had suffered an engine failure at Chaguaramas, Trinidad and Tobago, on March 1, 2018, could not be carried out by the crew and an arrest order due to the owner's financial difficulties. The tug 'Onyx' started towing the ship to Tuzla on Jan 1, 2021, upon completion of towage approval formalities. The convoy arrived at Tuzla anchorage on Feb 6. Upon completion of customs formalities, the tanker entered a shipyard on Feb 7 at 11 a.m. A detailed damage survey and technical inspection was to be carried out by the appointed surveyor panel.

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data