Allgemeine Informationen

IMO:
9530084
MMSI:
245924000
Rufzeichen:
PCKV
Breite:
41.0 m
Länge:
138.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Other Ship
Ship type:
Flagge:
Netherlands
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moored
Kurs:
59.5° / 0.0
Kompasskurs:
264.0° / 0.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moored
Gebiet:
Irish Sea
Zuletzt empfangen::
2024-04-18
vor 3 Min
Source:
T-AIS
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 1 Min
Source:
T-AIS
Berechnete ETA:

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2024-03-27
2024-04-09
13d 8h 10m
2024-03-20
2024-03-21
1d 7h 13m
2024-02-19
2024-03-13
23d 3h 54m
2024-02-14
2024-02-16
1d 18h 39m
2023-12-15
2024-02-12
59d 25m
2023-11-21
2023-11-27
5d 9h 32m
2023-11-06
2023-11-09
3d 4h 9m
2023-10-25
2023-10-26
21h 27m
2023-10-19
2023-10-21
2d 3h 13m
2023-10-05
2023-10-08
3d 9h 47m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
Liverpool Approach
2024-04-17
Abfahren
Fairway Buoy
2024-04-09
Abfahren
Fairway Buoy
2024-03-27
Ankommen
Fairway Buoy
2024-03-21
Abfahren
Fairway Buoy
2024-03-20
Ankommen
Fairway Buoy
2024-03-13
Abfahren
Fairway Buoy
2024-02-19
Ankommen
Hinweis: Alle Zeiten in UTC

Die neuesten Nachrichten

Vroon's MPI Adventure installs first offshore wind turbine on Sandbank west of Sylt

Wed Aug 03 09:39:56 CEST 2016 arnekiel

Vroon has announced that its wind-turbine installation vessel MPI Adventure has installed the first of 72 SWT-4.0-130 offshore wind turbines on the Sandbank offshore wind farm. Installation of the first turbine was completed last week, on 28 July, well ahead of the original schedule. Following completion of her contract to assist in commissioning the offshore substation on the Sandbank offshore wind farm, MPI Adventure was remobilised for these offshore wind-turbine-installation works. The vessel is capable of installing 6 of these complete offshore wind turbines per cycle. MPI has also been responsible for the design, engineering and manufacturing of the sea fastenings being used during transportation and installation of all 72 turbines. In addition, MPI is providing project management throughout the whole turbine campaign. Once completed in 2017, the wind farm will be capable of generating green electricity for more than 400,000 households. The Sandbank offshore wind farm is located approximately 90km west of the island of Sylt in the German Bight. http://en.portnews.ru/news/223789/

MPI Adventure contracted

Sat Apr 09 11:05:11 CEST 2016 arnekiel

Specialist offshore wind construction vessel ‘MPI Adventure’ has been contracted to assist with the commissioning works on the offshore substation of the Sandbank Offshore Wind Farm in German waters. MPI Adventure will provide accommodation services, lifting operations and provision of supplies. The Sandbank Offshore Wind Farm is located approximately 90km west of the island of Sylt in the German Bight. It will consist of 72 4.0MW turbines which will also be installed by MPI Adventure as of summer 2016. - See more at: http://www.maritimejournal.com/news101/industry-news/mpi-adventure-contracted#sthash.mL1oe2Ii.dpuf

MPI Adventure heading for Port of Tyne

Thu Oct 04 09:55:16 CEST 2012 arnekiel

The world’s largest wind turbine installation vessel is heading to the Port of Tyne on Oct. 4, 2012. The giant ship MPI Adventure has been commissioned by Narec, the National Renewable Energy Centre, to collect a 750-tonne Met Mast fitted with the latest technologies for measuring wind resource and collecting marine conditions and marine life data. It will be installed three miles offshore of Blyth to measure the wind resource for the proposed Blyth Offshore Wind Demonstration Site. MPI Adventure was launched from MPI Offshore’s base in Middlesbrough and is expected to arrive at the Port of Tyne on Oct. 4, 2012. http://www.nebusiness.co.uk/business-news/latest-business-news/2012/10/04/giant-ship-mpi-adventure-heading-for-port-of-tyne-51140-31961819/

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data