Allgemeine Informationen

IMO:
9796743
MMSI:
238019000
Rufzeichen:
9A3550
Breite:
44.0 m
Länge:
250.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Tankship
Ship type:
Flagge:
Croatia
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Anchored
Kurs:
282.9° / 4.0
Kompasskurs:
83.0° / 4.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
anchorage
Gebiet:
Black Sea
Zuletzt empfangen::
2024-04-20
vor 4 Min
Source:
T-AIS
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 4 Min
Source:
T-AIS
Berechnete ETA:

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2024-04-09
2024-04-11
2d 4h 13m
2024-02-13
2024-02-15
1d 20h 45m
2024-01-27
2024-01-29
1d 21h 59m
2024-01-20
2024-01-21
1d 8h 11m
2023-11-22
2023-11-25
2d 21h 35m
2023-11-01
2023-11-02
1d 3h 49m
2023-10-25
2023-10-29
3d 18h 31m
2023-10-08
2023-10-09
1d 8h 27m
2023-10-04
2023-10-06
1d 5h 27m
2023-09-22
2023-09-23
19h 54m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
Bosphorus Bridge 2
2024-03-30
Abfahren
Bosphorus Bridge 1
2024-03-30
Abfahren
Marmara Island
2024-03-29
Abfahren
Pantelleria East
2024-02-12
Ankommen
Sizilien
2024-02-11
Ankommen
Isla de Alboran
2024-02-09
Ankommen
Strait of Gibraltar
2024-02-08
Abfahren
Hinweis: Alle Zeiten in UTC

Die neuesten Nachrichten

Repairs completed

Sun Jun 20 12:58:33 CEST 2021 Timsen

Permanent repairs of the 'RAva' were completed to the satisfaction of class surveyor, and the salvage expenses were paid to the coastal safety account by the local agent on behalf of the owners. The fine imposed was also paid to the Harbour Master, and the departure permission thereupon was granted. The vessel resumed its voyage on June 18 at 9 p.m. towards Cartagena with an ETA as of June 24.

Power loss in Bosphorus

Sun May 30 13:39:45 CEST 2021 Timsen

The 'Rava', sailing under tug escort, suffered a blackout nroute from Fos-sur-Mer to Cartagena, and was disabled 300 meters from the shore at Istinye Point during the transit of the Bosphorous on May 28, 2021, at 7.20 p.m. Coastal Safety deployed the tug 'Kurtarma 11' and 'Kurtarma 12' as well as the fast rescue boat 'KEGM 5' to assist. After power was restored, the ship proceeded to the Alpha anchorage off Istanbul where it moored in pos. 40° 59.18' N 028° 57.67' E for necessary inspections and troubleshooting. Tankerska Plovidba and the crew onboard were conducting a full investigation to determine the cause of the incident. Photos and video: https://twitter.com/i/status/1398345117124247552 https://twitter.com/kiyiemniyet/status/1398324104713940997

Oil spill in Megara

Tue Mar 05 09:18:04 CET 2019 Timsen

An oil spill originated from the shore side/terminal installation pipeline during discharging operations of the "Rava" in the port of Megara the afternoon of March 3, 2019. When the crew noticed the leakage from the shore installation, it immediately stopped the cargo operation and alerted the terminal regarding leakage on their installation. At the time of the incident the vessel was discharging with only one COP (No. 1) with pressure of 2,5 bars on manifold No. 1 and 3,0 bars on manifold No. 3 while agreed/maximum permitted pressure by the terminal was 8 bars. 5,5 after the incident occurred, the discharging operation was resumed, and it was completed at 7.20 p.m. on March 4. Since some oil had polluted the hull along the waterline the oil was cleaned during discharging of remaining cargo at terminal expense. The spill caused pollution to an area of approximately 500 square metres. Oil response teams using detergents and absorbent materials were activated by the authorities. The vessel sailed on March 4 at 10.30 p.m. On March 5 it was moored in pos. 37° 51.91' N 023° 29.49' E on Piraeus anchorage.

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data