Allgemeine Informationen

IMO:
9085895
MMSI:
374377000
Rufzeichen:
H3IV
Breite:
22.0 m
Länge:
143.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Cargo Ship
Ship type:
Flagge:
Panama
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Anchored
Kurs:
292.8° / 0.0
Kompasskurs:
275.0° / 0.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
waiting
Gebiet:
Sea of Marmara
Zuletzt empfangen::
2020-06-06
vor 3 Min
Source:
T-AIS
Zielort:
ETA:
Max. Tiefgang:
Letzter Tiefgang:
Letztes Update:
vor 3 Min
Source:
T-AIS
Berechnete ETA:

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2020-06-06
4h 54m
2020-05-23
2020-05-29
5d 16h 11m
2020-04-27
2020-05-06
8d 22h 2m
2020-04-12
2020-04-13
1d 2h 32m
2020-03-09
2020-03-17
7d 21h 51m
2020-03-03
2020-03-05
1d 17h 5m
2020-02-24
2020-02-25
2h 6m
2020-02-21
2020-02-23
2d 5h 56m
2020-01-26
2020-01-28
2d 10h 19m
2019-12-31
2020-01-11
10d 17h 50m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
Marmara Island
2020-06-06
Abfahren
Pantelleria East
2020-06-02
Ankommen
Sizilien
2020-06-02
Ankommen
El-Jazair
2020-06-01
Abfahren
Isla de Alboran
2020-05-30
Ankommen
Strait of Gibraltar
2020-05-30
Abfahren
Strait of Gibraltar
2020-04-22
Ankommen
Hinweis: Alle Zeiten in UTC

Die neuesten Nachrichten

Two tugs damaged in incident on Thames

Fri Dec 21 10:25:40 CET 2012 Timsen

Already on Nov 15, 2012, at 6.00 a.m. the "Amber", leaving Tilbury Power Station suffered engine failure. The vessel subsequently went aground upstream of the PLA’s Denton Wharf base, having struck several moorings to which barges and tugs were secured. The Port of London Authority (PLA) managed the response to the incident from its London Port Control Centre at Gravesend. A PLA harbour service launch was on scene along with members of the PLA Marine Services team who are in the process of re-securing a barge and the tugs "Recruit" and "Mersina" which had gone adrift. The "Amber" was re-floated at 8.45 a.m. and berthed alongside Tilbury Landing Stage before moving into Tilbury Dock for inspection and repairs in the afternoon. The tugs and barge which were adrift earlier were secured. The "Mersina" remains on Denton Slipway to date, it had suffered damage at the shaft. The "Recruit" was threatened to become a write off. The "Amber" left Tilbury again on Nov 30.

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data