Allgemeine Informationen

IMO:
9085895
MMSI:
511101283
Rufzeichen:
T8A4587
Breite:
22.0 m
Länge:
143.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Cargo Ship
Ship type:
Flagge:
Palau
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moored
Kurs:
324.4° / 0.0
Kompasskurs:
34.0° / 0.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moored
Location:
Illichivsk (Illichivsk Port)
Gebiet:
Ukraine
Zuletzt empfangen::
2024-04-27
vor 44 Min
Source:
T-AIS
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 58 Min
Source:
T-AIS
Berechnete ETA:

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2024-04-22
2024-04-23
16h 20m
2024-03-22
2024-03-31
8d 14h 37m
2024-02-29
2024-02-29
12h 58m
2024-02-17
2024-02-26
8d 9h 20m
2023-10-23
2023-11-01
9d 4h 55m
2023-10-10
2023-10-10
7h 33m
2023-09-24
2023-10-09
15d 20h 44m
2023-07-09
2023-07-12
2d 19h 44m
2023-06-26
2023-06-26
8h 10m
2023-06-21
2023-06-22
3h 30m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
Bosphorus Bridge 2
2024-04-19
Abfahren
Bosphorus Bridge 1
2024-04-19
Abfahren
Marmara Island
2024-04-18
Abfahren
Marmara Island
2024-03-01
Ankommen
Bosphorus Bridge 1
2024-02-29
Ankommen
Bosphorus Bridge 2
2024-02-29
Ankommen
Bosphorus Bridge 2
2024-02-13
Abfahren
Hinweis: Alle Zeiten in UTC

Die neuesten Nachrichten

Two tugs damaged in incident on Thames

Fri Dec 21 10:25:40 CET 2012 Timsen

Already on Nov 15, 2012, at 6.00 a.m. the "Amber", leaving Tilbury Power Station suffered engine failure. The vessel subsequently went aground upstream of the PLA’s Denton Wharf base, having struck several moorings to which barges and tugs were secured. The Port of London Authority (PLA) managed the response to the incident from its London Port Control Centre at Gravesend. A PLA harbour service launch was on scene along with members of the PLA Marine Services team who are in the process of re-securing a barge and the tugs "Recruit" and "Mersina" which had gone adrift. The "Amber" was re-floated at 8.45 a.m. and berthed alongside Tilbury Landing Stage before moving into Tilbury Dock for inspection and repairs in the afternoon. The tugs and barge which were adrift earlier were secured. The "Mersina" remains on Denton Slipway to date, it had suffered damage at the shaft. The "Recruit" was threatened to become a write off. The "Amber" left Tilbury again on Nov 30.

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data