Allgemeine Informationen

IMO:
9007283
MMSI:
352001076
Rufzeichen:
3E2444
Breite:
30.0 m
Länge:
179.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Passenger ship
Ship type:
Flagge:
Panama
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moored
Kurs:
63.5° / 0.0
Kompasskurs:
323.0° / 0.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moored
Location:
Altinova (Yasarsan shipyard)
Gebiet:
Turkey
Zuletzt empfangen::
2022-06-29
vor 7 Min
Source:
T-AIS
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 5 Min
Source:
T-AIS
Berechnete ETA:

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2022-06-02
26d 17h 31m
2022-05-31
2022-06-02
1d 18h 38m
2022-04-12
2022-05-05
22d 17h 31m
2022-03-03
2022-04-12
40d 1h 36m
2022-02-24
2022-03-03
6d 18h 44m
2022-02-14
2022-02-23
9d 8h 45m
2021-01-09
2021-01-09
15h 53m
2020-03-21
2021-01-08
293d 13h 12m
2020-03-19
2020-03-19
1h 43m
2020-01-08
2020-03-19
70d 14h 52m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
Margate
2021-01-08
Abfahren
Canvey Island
2021-01-08
Ankommen
Gravesend
2021-01-08
Abfahren
Northfleet
2021-01-08
Ankommen
Northfleet
2020-03-21
Abfahren
Gravesend
2020-03-21
Ankommen
Canvey Island
2020-03-21
Abfahren
Hinweis: Alle Zeiten in UTC

Die neuesten Nachrichten

Repairs in Tuzla completed

Sat May 07 21:44:03 CEST 2022 Timsen

The 'European Seaway' shifted to Tuzla anchorage after completing permanent repairs. Sea trials will be carried out under the supervision of the class surveyor and shipyard engineers. Subsequently, a new set of trading documents will be issued by the flag state authority and the classification society. The vessel remained stationary at Tuzla anchorage as of May 7.

Repairs in Altinova continued

Mon Mar 21 12:21:22 CET 2022 Timsen

Since Feb 16, internal, external and bottom section steel members, thickness measurements were taken from all locations of the 'Sea Anatolia'. Diminution locations were marked and the steel replacement work commenced in dry dock at the shipyard in Yalova. Tightness test will be applied, upon completion of the steel replacement. While shore-based technical teams continued the repairs, the vessel remained stationary at Yalova as of March 21.

Repairs of ferry underway

Tue Feb 15 09:19:16 CET 2022 Timsen

The 'Sea Anatolia', which had experienced a technical failure while docked at Dover as 'European Seaway' on Aug 1, 2021, arrived at Yalova anchorage on Feb 6 under its new name. It berthed at the Altinova shipyard on Feb 7 upon completion of custom and immigration formalities. A detailed damage survey was carried out by a class surveyor together with the owner's superintendent and shipyard duty engineers. Repairs plan were issued by the classification society and commenced by shore based technical teams. Repairs have commenced, and the ship remained stationary as of Feb 15.

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data