Allgemeine Informationen

IMO:
9516686
MMSI:
218319000
Rufzeichen:
DFIC
Breite:
36.0 m
Länge:
94.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Other Ship
Ship type:
Flagge:
Germany
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Grounded
Kurs:
360.0° / -128.0
Kompasskurs:
511.0° / -128.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moored
Location:
Cuxhaven (Muetzelfeldt-Werft Cuxhaven)
Gebiet:
Germany
Zuletzt empfangen::
2020-11-25
vor 1 Min
Source:
T-AIS
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 2 Min
Source:
T-AIS
Berechnete ETA:

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2020-11-14
11d 2h 23m
2020-11-12
2020-11-13
1d 17h 47m
2020-11-08
2020-11-08
13h 5m
2020-10-31
2020-11-05
5d 5h 26m
2020-10-14
2020-10-18
4d 3h 21m
2020-09-29
2020-10-13
13d 21h 11m
2020-09-22
2020-09-28
5d 23h 5m
2020-09-02
2020-09-10
8d 7h 4m
2020-08-21
2020-08-31
10d 10h 6m
2020-08-15
2020-08-16
17h 50m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
Cuxhaven
2020-11-14
Ankommen
Elbe 1
2020-11-14
Ankommen
Wangerooge
2020-11-14
Ankommen
Weser Pilot Tonne 2
2020-11-14
Abfahren
Norderney
2020-11-14
Ankommen
Borkum
2020-11-14
Ankommen
Terschelling
2020-10-19
Abfahren
Hinweis: Alle Zeiten in UTC

Die neuesten Nachrichten

Smouldering fire in switchbox

Fri Apr 29 13:38:06 CEST 2016 Timsen

On Apr 28, 2016, at 12.30 p.m. a fire broke out aboard the "Wind Lift 1" enroute from Emden to the offshore wind farm Bard Offshore 1. The smouldering fire in a switchbox caused a partial power failure. The crew was able to put out the fire within short time with own means. In the morning of Apr 29 the jack up rig returned to Emden and berthed at the Ems Quay around 6 a.m. for repairs.

Worker missing, crew member injured during search operation

Thu Jan 26 08:56:59 CET 2012 Timsen

On Jan 25, 2012, at 9.15 a.m. a worker fell from a boat landing during construction work of a foundation of a wind turbine 55 nautical miles north-northwest of Borkum. A search was started for the missing man with the "Wind Lift I" as On-Scene Co-ordinator and the lifeboats "Alfried Krupp" of the DGzRS-station Borkum and the "Hannes Glogner" of the Station Norderney as well as a police helicopter and an SAR helicopter of the German Navy. The police helicopter saved a second man which had been involved in the accident and a crew member of the "Wind Lift 1", which was injured during the rescue work, and transported the two to Helgoland. The SAR helicopterstook a diver team out to sea which was searching for the missing. At the time of the accident there were south-east winds of six Beaufort with up to 50 km/h wind speed. Tomorrow, Thursday, representatives of the offshore industry meet the GMRS headquarters in Bremen. There present the life-savers assisted by their policy plans for the construction of US-funded emergency control room operators for offshore wind farms

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data