Allgemeine Informationen

IMO:
9332755
MMSI:
316011407
Rufzeichen:
CFN4888
Breite:
28.0 m
Länge:
160.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Passenger ship
Ship type:
Flagge:
Canada
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moving
Kurs:
48.8° / 0.0
Kompasskurs:
104.0° / 0.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moored
Location:
Victoria (Canada) (Victoria Shipyard)
Gebiet:
North America West Coast
Zuletzt empfangen::
2024-10-07
vor 1 Min
Source:
T-AIS
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 5 Min
Source:
T-AIS
Berechnete ETA:

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2024-10-01
5d 22h 33m
2024-10-01
2024-10-01
8h 3m
2024-10-01
2024-10-01
33m
2024-10-01
2024-10-01
39m
2024-10-01
2024-10-01
38m
2024-10-01
2024-10-01
40m
2024-09-30
2024-09-30
38m
2024-09-30
2024-09-30
37m
2024-09-30
2024-09-30
40m
2024-09-30
2024-09-30
8h 50m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
-
-
-

Die neuesten Nachrichten

Ferry delayed due to medical emergency

Tue Apr 23 12:19:32 CEST 2024 Timsen

The noon sailing of the 'Coastal Renaissance' on April 21, 2024, was delayed leaving Swartz Bay on Monday due to a medical emergency. Ambulance paramedics were called to assist the affected passenger. The delay lasted 54 minutes. No further details were available.

Ferry suffered mechanical problem

Tue Jul 13 18:51:51 CEST 2021 Timsen

The 'Coastal Renaissance' suffered a mechanical problem while operating on the Horseshoe Bay-Departure Bay route, which eventually led to a three-sailing wait, in the morning of July 9, 2021. The B.C. Ferries has recommended travellers switch to the Duke Point-Tsawwassen route.

Ferry drydocked for propeller repairs

Wed May 19 09:49:33 CEST 2021 Timsen

The 'Coastal Renaissance was docked in Seaspan’s Vancouver Drydock on May 15, 2021, at 11.45 a.m. for repairs to one of its propeller hubs. The work was expected to have been completed by May 22, when the ship will depart North Vancouver and return to Tsawwassen. It will resume service on the Tsawwassen to Duke Point run on May 23.

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data