Allgemeine Informationen

IMO:
9252280
MMSI:
235009956
Rufzeichen:
VQPX7
Breite:
15.0 m
Länge:
85.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Tankship
Ship type:
Flagge:
United Kingdom
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Anchored
Kurs:
115.0° / -12.0
Kompasskurs:
23.0° / -12.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
anchorage
Gebiet:
North Sea
Zuletzt empfangen::
2020-06-02
vor 5 Min
Source:
T-AIS
Zielort:
ETA:
Max. Tiefgang:
Letzter Tiefgang:
Letztes Update:
vor 26 Min
Source:
T-AIS
Berechnete ETA:

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2020-05-31
2020-06-01
20h 32m
2020-05-29
2020-05-30
1d 5h 41m
2020-05-27
2020-05-29
1d 19h 14m
2020-05-25
2020-05-26
22h 4m
2020-05-23
2020-05-24
17h 47m
2020-05-13
2020-05-23
10d 7h 30m
2020-05-10
2020-05-12
1d 19h 52m
2020-05-06
2020-05-06
44m
2020-05-06
2020-05-06
17h 12m
2020-05-06
2020-05-06
1h 44m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
Vlissingen
2020-06-01
Ankommen
Terneuzen
2020-06-01
Ankommen
Hans Weert
2020-06-01
Abfahren
Nauw van Bath
2020-06-01
Ankommen
Hinweis: Alle Zeiten in UTC

Die neuesten Nachrichten

Bunker tanker with engine trouble

Sun Dec 22 11:55:37 CET 2019 Timsen

The 'Whitchampion'. en route from Southampton to St. Helens Anchorage, suffered engine trouble and consequently proceeded at reduced speed and with a reduced steering capability, in position 50 28 52.8 N, 000 17 18.6 E, on Dec 20, 2019, at 2 p.m. The tanker was carrying 3887 tonnes of gas oil as bunker on board. It berthed in Portsmouth on Dec 21 at 6 a.m.

Turbo charger failure off Portland Bill

Fri Oct 18 22:10:41 CEST 2019 Timsen

The 'Whitchampion', en route from Plymouth to Southampton with a crew of eight on board, suffered an engine turbo-charger failure six miles from Portland Bill in position 50 25 09 N, 002 25 09 W, on Oct 17, 2019, at 09.50 a.mThe vessel was diverted to Portland for repairs, and a tug was on the way from Portland. The tug assisted the vessel into Portland Harbour at 2.50 p.m. The estimated time for completion of repairs was about 48 hours.

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data