Allgemeine Informationen

IMO:
9252280
MMSI:
235009956
Rufzeichen:
VQPX7
Breite:
15.0 m
Länge:
85.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Tankship
Ship type:
Flagge:
United Kingdom
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moored
Kurs:
324.3° / 2.0
Kompasskurs:
321.0° / 2.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moored
Location:
Southampton (Southampton Docks)
Gebiet:
English Channel
Zuletzt empfangen::
2024-04-20
vor 2 Min
Source:
T-AIS
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 5 Min
Source:
T-AIS
Berechnete ETA:

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2024-04-19
9h 52m
2024-04-18
2024-04-19
23h 26m
2024-04-16
2024-04-18
2d 27m
2024-04-15
2024-04-15
13h 44m
2024-04-13
2024-04-14
13h 45m
2024-04-13
2024-04-13
2h 20m
2024-04-12
2024-04-13
15h 38m
2024-04-11
2024-04-12
1d 3h 15m
2024-04-11
2024-04-11
8h 27m
2024-04-10
2024-04-11
3h 1m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
Southampton Approach
2024-04-19
Abfahren
Fawley Approach
2024-04-19
Abfahren
Portsmouth Approach
2024-04-19
Ankommen
Portsmouth Approach
2024-04-18
Abfahren
Fawley Approach
2024-04-18
Ankommen
Southampton Approach
2024-04-18
Ankommen
Southampton Approach
2024-04-16
Abfahren
Hinweis: Alle Zeiten in UTC

Die neuesten Nachrichten

Bunker tanker with engine trouble

Sun Dec 22 11:55:37 CET 2019 Timsen

The 'Whitchampion'. en route from Southampton to St. Helens Anchorage, suffered engine trouble and consequently proceeded at reduced speed and with a reduced steering capability, in position 50 28 52.8 N, 000 17 18.6 E, on Dec 20, 2019, at 2 p.m. The tanker was carrying 3887 tonnes of gas oil as bunker on board. It berthed in Portsmouth on Dec 21 at 6 a.m.

Turbo charger failure off Portland Bill

Fri Oct 18 22:10:41 CEST 2019 Timsen

The 'Whitchampion', en route from Plymouth to Southampton with a crew of eight on board, suffered an engine turbo-charger failure six miles from Portland Bill in position 50 25 09 N, 002 25 09 W, on Oct 17, 2019, at 09.50 a.mThe vessel was diverted to Portland for repairs, and a tug was on the way from Portland. The tug assisted the vessel into Portland Harbour at 2.50 p.m. The estimated time for completion of repairs was about 48 hours.

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data