Allgemeine Informationen

IMO:
9139323
MMSI:
636018620
Rufzeichen:
D5QO6
Breite:
14.0 m
Länge:
88.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Cargo Ship
Ship type:
Flagge:
Liberia
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moving
Kurs:
83.7° / 0.0
Kompasskurs:
78.0° / 0.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moving
Gebiet:
Alboran Sea
Zuletzt empfangen::
2024-04-18
vor 1 Tag
 
Source:
T-AIS
Von:
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 1 Tag 
Source:
T-AIS
Berechnete ETA:

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2024-04-17
2024-04-18
6h 9m
2024-04-11
2024-04-12
22h 28m
2024-03-31
2024-04-08
8d 11h 18m
2024-03-27
2024-03-29
2d 3h 18m
2024-03-18
2024-03-18
6h 36m
2024-03-01
2024-03-02
14h 29m
2024-02-27
2024-03-01
3d 11m
2024-02-08
2024-02-08
1h 51m
2024-01-31
2024-02-02
1d 13h 4m
2024-01-29
2024-01-30
1d 10h 52m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
Strait of Gibraltar
2024-04-17
Abfahren
Isle of Scilly
2024-04-09
Ankommen
St. Georges Channel
2024-03-30
Ankommen
Fairway Buoy
2024-03-29
Abfahren
Fairway Buoy
2024-03-26
Ankommen
St. Georges Channel
2024-03-25
Abfahren
Strait of Gibraltar
2024-03-19
Ankommen
Hinweis: Alle Zeiten in UTC

Die neuesten Nachrichten

Bulkcarrier with engine damage in Algeciras

Mon Apr 06 19:24:02 CEST 2020 Timsen

On March 22, 2020, at 6.30 p.m. while the 'Rix Plato' was proceeding to the port entrance of Tangiers Med to take the pilot, the main engine started to work with abnormal exhaust gas and development of black smoke along with a high temperature. The problem appeared to originate from the ME cylinder No 8. A local surveyor was instructed and attended on board. Prior to the surveyor's attendance, the engine crew already started to overhaul themain engine unit no. 8. The chief engineer stated that after his investigation and unit overhauling, he noted an excessive amount of lube oil in main engine cylinder no. 8. Once the cylinder head was removed, he noted that pthe iston head was heavily damaged. Repairs have been carried out by the crew, and the vessel proceeded to Algeciras on March 27. Shortly before the departure from Tangiers, there was another problem with the main engine, but the vessel proceeded to the port with own power to Algeciras, where the vessel berthed at the Cernaval Group Shipyard on MArch 30. where the main engine was opened. A damage to the crank shaft on the main engine big end journal cylinder n. 8 has been noted. The measurements from theshipyard showed that it was out of a repairable size. The owners were now trying to get other independent measurements. The vessel left the port again on April 7 at 6.40 p.m. It berthed at the Bolderaya Shipyard in Riga on April 25 at 4.40 p.m. for further repairs.

Sold

Wed Mar 09 11:02:20 CET 2016 arnekiel

Sold to undisclosed buyers for Euro 1.5 mill

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data